Abstract
This article presents a new mathematical model for a dynamic flow shop manufacturing cell scheduling problem (DFMCSP) with agreeable job release date for each part family where family setup times are dependent on sequence of parts within families. It means this article considers non-permutation schedules for both sequence of families and sequence of parts within families. The objective is minimizing the Makespan (Cmax). Since, this problem belongs to NP-Hard class. Therefore, reaching an optimal solution in a reasonable computational time by using exact methods is extremely difficult. Thus, this article proposes meta-heuristic methods such as Genetic Algorithms (GA) and Tabu Search (TS). Finally, the computational results compare efficiency of the proposed algorithms under the performance measures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Applied Metaheuristic Computing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.