Abstract

High wind energy curtailment during winter and early spring in north China has drawn widespread concern in recent years, which, at source, results from the incongruous planning between wind power development and other generation expansion. However, the scenarios obtained by traditional planning method without considering the seasonal heat supply constraints are far from the actual operation stage. More difficulty lies in the lack of sequential data of wind power and load demand in planning stage. A nonsequential probabilistic production simulation model is proposed to evaluate the wind energy curtailment during the heat supply period, which only needs the input data of the cumulative probability function (CDF) and/or probability density function (PDF) of heat demand, electricity demand, and wind power. Then an algorithm based on the equivalent joint energy function and minimal power-heat ratio method is applied to solve the model. The simulations have been performed based on the actual data of a large wind power zone in north China. Comparing with the previous sequential simulation method, the precision of the proposed method is satisfactory and the calculation time is dramatically reduced.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.