Abstract
This study develops a 9-zone test system based on the Midcontinent Independent System Operator (MISO) data for application in electric power market studies. This 9-zone test system models MISO's original seven midwestern zones together with two recently-incorporated southern zones operating over a 15-line AC transmission grid. Generators with different fuel types and capacities submit hourly supply offers in a day-ahead market (DAM). Load-serving entities submit hourly demand bids into a day-ahead market in the form of a 24-hour regional load profile. This 9-zone test system allows a wide range of sensitivity studies. To illustrate the capabilities of the 9-zone test system, this study undertakes a comparative study of DAM Locational Marginal Price (LMP) outcomes for MISO prior to and after the integration of the two southern zones by conducting test-bed simulations for 7-zone and 9-zone test cases based on MISO data.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.