Abstract

The geostatic stress, coal mine gas and disturbances produced by external loading can undermine the stability of a borehole and cause the borehole to collapse in a soft coal seam, which results in a poor efficiency of drilling long boreholes and draining gas in a soft coal seam. To improve the efficiency of drilling boreholes and draining gas in a soft coal seam, we propose a drilling technology of protecting the borehole by spraying foam concrete slurry onto the surface of borehole wall during drilling in a soft coal seam. To realize this process, we propose spraying foam concrete onto the borehole wall during drilling with a foldable drill bit and double drill pipes. Based on this new technology, the equipment and the material required for drilling long boreholes in a soft coal seam were studied. Finally, this new technology was tested in the Zhaozhuang mines in the Shanxi Province of China. The test results indicate the following: the process of spraying foam concrete on the borehole wall can relieve borehole collapse; the plant-based foam concrete has good air permeability, and has no effect on the permeability of the borehole wall; and the novel process of drilling boreholes and spraying foam concrete is an effective drilling process, which can relieve borehole collapse, improve the drilling efficiency and improve the draining efficiency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call