Abstract

In order to realize the safety, high efficiency and rapidity of hard rock tunneling, we propose the drilling & hydraulic impact hard-rock tunneling (DHIHT) technology and method. Based on the LS-DYNA explicit module and APDL programming, the key parameters of DHIHT, including drilling spacing and drilling radius, were investigated. The simulation results show that: the drilling spacing should not exceed 0.20m-larger distances weaken the actual breaking effect; the best drilling radius is about 0.035m, larger or smaller distances would both decrease the effect of drilling-hole free surfaces. The field impact breaking experiments were conducted in Baitaizi township granite quarry, Jinzhou, Liaoning province, China. The experiment results indicate that DHIHT is a feasible method for hard-rock tunneling, but its efficiency still needs to be further optimized and improved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call