Abstract

Project managers always try to make the best decisions in order to complete their projects in the shortest period of time, with the least amount of costs, and with the highest degree of quality. Therefore, the process of decision-making is conducted in a triangle of time, costs, and quality. This triangle is a crucial part of management process throughout the execution of the project. However, in all problems, some unpredictable situations may be faced. In such situations, some or all parameters of the problem are expressed by uncertain variables. In this paper, a stochastic time-costquality trade off project scheduling problem (STCQTP) considering multiple-execution modes, preemption, and generalized precedence relations is developed. In order to solve the STCQTP, a hybrid solution approach based on Stochastic Chance Constraint Programming (SCCP) and Goal Programming (GP) is proposed. SCCP and GP are used to handle the uncertain nature and multiple-objectives of STCQTP, respectively. Numerical example is solved in order to illustrate the applicability of proposed model and solution approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.