Abstract

In this paper, a new scheme to control an Static Synchronous Series Compensator (SSSC) installed in a two-area power system is proposed. The power system is equipped with the SSSC to improve Load-Frequency Control (LFC). In the proposed scheme, SSSC is able to compensate for load changes in both areas on both sides of SSSC. Objective functions of designing parameters are based on Integral of Time multiplied by Absolute value of the Error (ITAE). Parameters of conventional integral controllers and active power controller of SSSC are designed using defined optimization problems. To solve the optimization problems, PSO algorithm is used. Simulation results of the two-area power system equipped with SSSC and without SSSC are compared.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.