Abstract
Since the Grid is a dynamic environment, the prediction and detection of available resources in near future is important for resource scheduling. Economic-based grid management has been viewed as a feasible approach to carry out fair, efficient and reliable scheduling. One key issue in Economic-based grid strategy is to inform about available resources. In this paper, we present a novel predictable method to specify available resource in economic-based grid. This method use a rough set analysis by scheduler to divide resources in groups and then grant a priority to each group based on cost price and efficiency of nodes. The result show that our proposed method has an acceptable performance and it try to use cheaper and suitable resources for each job to decrease cost price of computation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.