Abstract

A new resource constrained scheduling method based on dynamic combination of genetic algorithm(GA) and ant algorithm (AA) is proposed in this paper. In this method, initial pheromone distribution is generated from GA, and then optimal solutions are searched using AA. Dynamic switching conditions are also discussed. Experimental data indicates that the average scheduling time under resource constraints by our method is 5.6% less than GA and 3.3% less than AA.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call