Abstract

At present, the prediction of failure probability is based on the operation period for laid pipelines, and the method is complicated and time-consuming. If the failure probability can be predicted in the planning stage, the risk assessment system of gas pipeline will be greatly improved. In this paper, the pre-laying assessment model is established to minimize risk of leakage due to piping layout. Firstly, Fault Tree Analysis (FTA) modeling is carried out for urban natural gas pipeline network. According to expert evaluation, 84 failure factors, which can be determined in the planning stage, are selected as the input variables of the training network. Then the FTA model is used to calculate the theoretical failure probability value, and the failure probability prediction model is determined through repeated trial calculation based on BP (Back Propagation Neural Network) and RBF (Radial Basis Function), for obtaining the optimal network parameter combination. Finally, two prediction models are used to calculate the same example. By comparing our pre-assessment model with the theoretical prediction consequences of the fault tree, the results show that the error of RBF prediction model can be close to 3%, which proves the validity and correctness of the method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call