Abstract

A conceptual construction management model can be applied to the metaverse 3D technology in this study, which demonstrates how accelerated back-and-forth replays of the construction process can be used to evaluate the impact of new decisions on the project. Participants in the proposed model will be able to see exactly how their decisions during construction affect the progress of the project. In order to develop this model, three phases are required: 1) Analyzing the problem and planning the algorithm, 2) collecting data and designing the hybrid model utilizing artificial intelligence and construction network scheduling techniques, and 3) coding the algorithm. The design-based research will contribute to the development of new meta-models for construction management, present innovative ideas for students, engineers, and managers working in the field of construction management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.