Abstract

With the purpose of environment protection, polluted emissions should be considered as an additional criteria, besides the fuel cost objective, to implement the optimal operation of hydrothermal power systems which are included thermal and hydro power plants. This paper proposes a novel cuckoo search algorithm (NCSA), developed from cuckoo-inspired optimization algorithm, to solve the multi-objective short-term fixed-head hydrothermal scheduling (HTS) problem which considers both fuel cost objective and emission cost objectives. In the proposed approach, there are two modifications, merging the exploration and exploitation phases and setting one rank parameter to handle the inequality constraints, to improve the convergence rate and the performance of NCSA. To verify its performance, some test systems with the quadratic fuel cost function of thermal units accompanied with emission objective functions have been implemented. The results have revealed that the NCSA method is a very promising method for solving the multi-objective short-term fixed-head HTS problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.