Abstract

This paper gives a new modified technique for evaluating non-convex economic dispatch (NCED) problem having non-linear, discontinuous cost function. This new particle swarm optimization technique incorporates time varying acceleration coefficients (NPSOTVAC). The highly non-linear cost function due to ramp rate limit, prohibited operating zones and valve point loading effect is considered in the proposed method. The effectiveness of proposed NPSOTVAC algorithm is proved through test on 6 and 15 unit test systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call