Abstract

In a single segment Foundation Fieldbus system, a link active scheduler, according to a pre-defined schedule time list, controls all remote periodic message transfers between different field devices on bus. The remote periodic message not only has time constraints but also often has precedence constrains. In this paper a new method to build the schedule time list is proposed, in which both time constraints and precedence constrains are considered and described by modifying release time and deadline. The method proposed is based on slack time monotonic and local search. An example of application shows the process of building FF schedule time list.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.