Abstract

In NTT's telecommunication buildings, it has been difficult to measure the earth resistance of telecommunication power system's grounding after services have started because the grounding conductor cannot be removed from the earth electrode. Recently, earth electrodes of most of the buildings have been mutually bonded to protect the facilities against lightning surges, so it has become difficult to measure the earth resistance of the individual earth electrodes. Furthermore, the measurement itself has become difficult using the traditional earth tester, which uses assistant electrodes, since the land around most telecommunication buildings has been paved with asphalt or concrete. The authors have developed a new method of measuring the earth resistance of each of the mutually bonded electrodes under these circumstances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.