Abstract

The risk management to the construction engineering plays an ever increasing role in modern engineering project management. In this study, a new risk evaluation method of engineering project is proposed - the DHGF algorithm, its character is to choose certain evaluation methods at different stages of the evaluation process. During the evaluation, the improved Delphi method is used to establish the comprehensive evaluation index system; AHP is used to determine the weight of every evaluation index; the fuzzy evaluation method which introduced grey correlation analysis is used to determine the risk grade and make the comprehensive evaluation. DHGF algorithm brings together the merits of Delphi, AHP, grey correlation analysis and fuzzy comprehensive evaluation and provides a scientific and rational approach to evaluate the owner of engineering project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.