Abstract

A Markov model for base-loaded units, called the LLM (load linked Markov) model, for use in a probabilistic production costing algorithm is described. This LLM model recognizes the relationship between the need for operating a base-loaded unit and the system load cycle. A comparison of the results obtained by using a traditional production costing method, the OPCOST method with explicit consideration of unit duty cycle effects, and the new method using the LLM model for base-loaded units, called the PROCOP method, shows significant differences in the energies produced by the base-loaded units and consequently the other units. The linkage of a base-loaded unit's need for operation to the load cycle avoids the assumption of the traditional model that the base-loaded units are equally needed all times. It also avoids the ad hoc treatment of outage postponability of base-loaded units. Hence, the PROCOP method is more physically based and is likely to be more accurately responsive to change in the load cycle and other system parameters. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.