Abstract

ABSTRACT Aiming to study the feasibility of the integrated suction bucket jacket foundation wet-towing, applicable sea conditions, and factors affecting the floating stability, SESAM finite element software was used to analyse floating stability during wet towing. First, two wet-towing methods for offshore wind turbine supporting structures were introduced in this paper. Second, the influence of sea conditions, draft depth, and towing speed on the floating stability of the overall structure during the integrated wet-towing process of the two methods were studied. Finally, the influence of sea conditions and draft depth on the foundation structure dynamic response during the integrated floating process. The research results show that the tri-bucket jacket structure itself or the integrated structure (bucket foundation-tower-wind turbine-special auxiliary floating vessel) can meet the requirements of long-distance wet-towing in level 5 sea conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.