Abstract

In this paper, a multiple objective optimization technique, based on simulation, and a taboo search algorithm are proposed for loading and scheduling Cellular Manufacturing systems (CM). Machine independent capability units known as Resource Elements (REs) are used to define the processing capabilities of machines and the processing requirements of parts. The loading problem is formally represented by a Goal Programming formulation with the objectives of system performance measures that are obtained by a simulation-based scheduling system. The problem is solved by a taboo search based algorithm. The proposed integrated system is implemented in C/C++ programming language and simulation. A practical case study is also explained and reported in detail.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.