Abstract

There is a need for increased capacity short-circuit Laboratories. In that view Electricite de France is building a new test station, supplied from the 400 kV network and from 2 generators ? Direct short-circuit capacity will be higher than 6,000 MVA for single phase tests ?Synthetic testing will increase that capacity to 30,000 to 60,000 MVA (single phase) ?400 kV supply is now ready, and the first short-circuit transformer was successfully tested in October 1970. Operation is intended to start in 1973.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.