Abstract

Gob-side entry retaining technology is an effective method for sustainable exploitation of coal resources and has been widely used in China. However, there are a large surrounding rock deformation and hard support in the gob-side entry retaining. In this paper, take the gob-side entry retaining in thin coal seam from Jiyang Coal Mine as the engineering background. Firstly, using FLAC software to simulate and analyze the deformation and stress distribution of gob-side entry surrounding rock in different schemes. Secondly, a new coupling support method was put forward after taking full consideration of the simulation results and field engineering experiences, namely: “bolt-mesh-anchor” for basic support, single hydraulic props as reinforced support of gob-side entry, and reinforced filling wall with bolts. In-situ engineering practices showed that this method has a good effect on controlling the deformation of gob-side entry surrounding rock and creates the better conditions for normal production of the working face.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.