Abstract

The Resource Constrained Project Scheduling Problem (RCPSP) is a well-studied academic problem that has been shown to be well suited to optimization via Genetic Algorithms (GA). In this paper, a new method will be designed that would be able to solve RCPSP. This research area is very common in industry especially when a set of activities needs to be finished as soon as possible subject to two sets of constraints, precedence constraints and resource constraints. The presented algorithm in this paper is used to solve large scale RCPSP and improves solutions. Finally, for comparing, results are reported for the most famous classical problems that are taken from PSPLIB.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call