Abstract

The Resource Constrained Project Scheduling Problem (RCPSP) is a well-studied academic problem that has been shown to be well suited to optimization via Genetic Algorithms (GA). In this paper, a new method will be designed that would be able to solve RCPSP. This research area is very common in industry especially when a set of activities needs to be finished as soon as possible subject to two sets of constraints, precedence constraints and resource constraints. The presented algorithm in this paper is used to solve large scale RCPSP and improves solutions. Finally, for comparing, results are reported for the most famous classical problems that are taken from PSPLIB.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.