Abstract

In this paper, dynamic programming for sequencing weighted jobs on a single machine to minimizing total tardiness is focused, to significance of fuzzy numbers field, and importance of that for decision makers who are facing on uncertain data, combination of dynamic programming and fuzzy numbers is applied. A random scheduling problem with fuzzy processing times is given and solved. In addition, algorithm consuming time during solving same category problem and different sizes are analyzed that for large problem CPU time usage is extremely unaffordable. Therefore demonstration of near-exact heuristic method such as Genetic Algorithm (GA) appears. In this paper sufficient discussion around solving this kind of problems and their algorithms analysis and a combination between Dynamic Programming (DP) and genetic algorithm as a newly born method is proposed that stand on DP performance and genetic algorithm search power, and finally comparison on the recent developed method has been held. Then this method can deal with real-world problem easily. Thus, decision makers actually can use this modification of dynamic programming for coping with un-crisp problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.