Abstract
The optimal, resilient and flexible operation of the power system is one of the most important challenges of the power grid. Fast resources as a backup capacity to provide power are one of the ways the power system to be more flexible and resilient. In this paper, a new joint power and reserve scheduling is done considering scheduling based on power instead of scheduling based on energy, the correct management of the thermal units’ ramp, the use of responsive loads includes a collection of commercial customers and plug-in electric vehicles (PEVs) in the secondary (15-minute) and tertiary (30-minute) reserves and discharge management of PEVs. A part of the power demand of these responsive loads is provided as free by renewable resources in times when there are no bad weather conditions. The use of responsive loads, correct management of the ramp of thermal units and a part of the discharge of PEVs can help restore the network quickly. The mixed-integer linear programming (MILP) method has been used to solve the joint power and reserve scheduling problem. The results show that the proposed model can lead to more flexibility and resiliency of the system and reduce the cost of the system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.