Estimation at completion is an important tool for supervising the performance and risk of each project, in order to estimate the project completion time and final cost. This calculation is one of the most important goals of project managing. In this paper, a new estimation at completion approach is presented for estimation of finishing time and final cost of the project. The innovation of this paper can be organized as using particle filter as one of the strong nonlinear filtering methods for next estimation state of the system by using smoothed data which is done by filter itself, based on autoregressive fitted model. After estimating next states, it will be possible to predict system’s reaction in later seconds and the time and cost of finishing the project are estimated for comparing the performance and efficiency of invented method. The simulation results demonstrate the performance of proposed scheme in comparison with older approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.