Abstract

This article investigates the two-machine flow-shop group scheduling problem (GSP) with sequence-dependent setup and removal times, and job transportation times between machines. The objective is to minimise the total completion time. As known, this problem is an NP-hard problem and generalises the typical two-machine GSPs. In this article, a new encoding scheme based on permutation representation is proposed to transform a random job permutation to a feasible permutation for GSPs. The proposed encoding scheme simultaneously determines both the sequence of jobs in each group and the sequence of groups. By reasonably combining particle swarm optimisation (PSO) and genetic algorithm (GA), we develop a fast and easily implemented hybrid algorithm (HA) for solving the considered problems. The effectiveness and efficiency of the proposed HA are demonstrated and compared with those of standard PSO and GA by numerical results of various tested instances with group numbers up to 20. In addition, three different lower bounds are developed to evaluate the solution quality of the HA. Limited numerical results indicate that the proposed HA is a viable and effective approach for the studied two-machine flow-shop group scheduling problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.