Abstract
Flexible manufacturing system control is an NP-hard problem. A cyclic approach has been demonstrated to be adequate for an infinite scheduling problem because of maximal throughput reachability. However, it is not the only optimization criterion in general. In this article we consider the minimization of the work in process (WIP) as an economical and productivity factor. We propose a new cyclic scheduling algorithm giving the maximal throughput (a hard constraint) while minimizing WIP. This algorithm is based on progressive operations placing. A controlled beam search approach has been developed to determine at each step the schedule of the next operations. After presenting the main principles of the algorithm, we compare our approach to several most known cyclic scheduling algorithms using a significant existing example from the literature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Flexible Manufacturing Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.