Abstract
This paper introduces a new construction practice, termed as the tunnel-column method, used in constructing a metro station in Beijing, China. The station is located just under the western side of Tian'anmen Square. A numerical analysis was performed for the new method before the construction. The numerical prediction agreed well with in situ measurements, the ground movement induced by excavation was well controlled. The experience of this project is valuable to the similar problems of large-scale underground excavation in urban areas.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.