Abstract

Recently, it has been reported that the aerobic/extended-idle (AEI) regime can achieve a satisfied biological phosphorus removal (BPR). Although the AEI regime has exhibited some merits, its main drawback that the extended-idle phase (e.g., 210–450min) is much longer than the anaerobic phase (e.g., 60–120min) performed in the aerobic/oxic (A/O) regime requires to be addressed. In this study, a new configuration of sequencing batch reactor (SBR) with sludge tank halved (STH-SBR) was therefore designed. After stable operation, 96.9±0.5% of total phosphorus was removed in the STH-SBR, which was higher than that in the AEI-SBR (86.9±0.8%) and A/O-SBR (84.7±1.3%). Further investigations showed that the biomass cultured in the STH-SBR contained more polyphosphate accumulating organisms but less glycogen accumulating organisms than that in the AEI-SBR and A/O-SBR. In the STH-SBR, the aerobic glycogen accumulation was lower than that in the A/O-SBR while the average idle phosphorus release was greater than that in the AEI-SBR. Finally, the key enzyme activities in the AEI and A/O regimes were compared for the first time, and the reasons for the AEI regime showing lower exopolyphosphatase and polyphosphate kinase activities were also discussed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call