Abstract

Traditional engineering cost control is to figure out the corresponding quantities of projects based on the construction drawing, and then apply the relevant quotas to determine the cost. However, for some extra large engineering projects, due to design depth, construction technology and other factors, the traditional method of cost control can not meet the requirements. This article will explore a new method for such kind of cost control from the perspective of value management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.