Abstract

Cutterhead torque is a crucial parameter for the design and operation of earth pressure balance (EPB) shield tunneling machine. However, the traditional calculation models of cutterhead torque are too rough or exist gross errors under variable geological conditions. In order to improve the precision of the calculation model of cutterhead torque, dynamic operation parameters are considered and a new model is proposed. Experiment is carried out on a Φ1.8 m shield machine test rig and the calculating result with the new model is compared with the experimental data to verify the validity of the new model. The relative error of the new model is as low as 4% at smooth stage and is reduced to 5% at the end of trembling stage. Based on the results of the new model and the test data obtained from the Φ1.8 m test rig and the construction site, the inner relationships between several operation parameters and cutterhead torque are investigated and some quantitative conclusions are obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.