Abstract

Dual-resource constrained flexible job shop scheduling problem has become a hot research field in recent years. However, few studies have considered workers’ boredom sensations when allocating resources and scheduling tasks, leading to inappropriate task allocation and negative effects such as efficiency reductions and absenteeism. Therefore, a new boredom-aware dual-resource constrained flexible job shop scheduling problem is investigated in this study, which considers the increase in workers’ boredom caused by repetitive job assignments and constructs an efficiency function to characterize the impact of workers’ boredom. For this problem, a bi-level lexicographic model, which takes the effective completion of all manufacturing tasks as the primary optimization objective and higher worker job satisfaction as the secondary optimization objective, is established. A two-stage multi-objective particle swarm optimization algorithm with a three-dimensional representation scheme is presented to solve this model. In this algorithm, a new position-updating mechanism and a local search strategy are devised to effectively evolve the solution, and a decomposition strategy with a self-adaptive neighborhood size and a boundary exploration mechanism are embedded to obtain a uniformly distributed Pareto front. Experimental results confirm the superiority of the presented model and algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.