Abstract

This paper proposes a new np control chart by utilizing the information on the past subgroups through the idea of multiple dependent state sampling. The proposed control chart has two pairs of control limits and their parameters are determined by considering the target in-control average run length (ARL). To check the efficiency of the proposed control chart, the out-of-control ARLs are evaluated for different process shift. The efficiency of the proposed chart is compared with the traditional Shewhart np control chart and the results show that our proposed control chart has a better performance than the traditional np control chart.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.