Abstract

Hydroelectric power stations are responsible for renewable energy generation, especially in countries with many rivers such as Brazil. It is very important to have good estimates of the hydrological flow in order to determine whether thermoelectric power plants should begin operation, an event that would increase the costs of electricity and also have aterrible environmental impact. The monthly flow of a river was estimated using two recurrent neural networks techniques: Long-Short Term Memory (LSTM) and Gated Recurrent Unit (GRU). The results were compared with other articles that had the same structure and used the same data: the Rio Grande river in the Furnas and Camargos dam.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call