Abstract

<p>Addressing loss due to transmission and its cost allocation in deregulated electricity market is an essential issue. Independent System Operator (ISO) provides the active power loss from the generators and the associated cost is allocated to the concerned parties in a fair way. The generators and loads participate in the loss/cost allocation process. The highlight of the paper is that the effect of mutual inductance (MI) that exists on transmission line in transmission loss/cost allocation process for multlateral contracts is illustrated. To demonstrate the effect of mutual inductance, the results of existing loss allocation methods like penalized quoted cost (PQC) based approach are discussed. Effect of mutual inductance is presented using an IEEE 30 bus system. The simulation results are carried out using MATLAB R2014a. The result shows that mutual inductance has a significant impact on transmission loss and hence cannot be ignored.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.