Abstract

The direct application of the theory of constraints (TOC) in project management is known as critical chain project management (CCPM) which is introduced by Goldratt. It is considered to be one of the popular approaches to project management. One of the most significant shortcomings in CCPM is the lack of mathematical analysis. Specifically, in buffer sizing step, Goldratt suggests using of 50% of critical chain lengths as a project buffer. Recently some approaches have been introduced to overcome this problem in CCPM. The fundamental research issues we address in this paper are the use of lognormal distribution for tasks completion time and integrate the risk of tasks in order to determine the parameters of distribution. In the next step a new method is proposed to size the buffer based on root square error method (RSEM) approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.