Abstract

The human has developed a technology to produce electricity through the hydroelectric power plant to make use of water in agriculture, transport, industry, and energy. Many hydroelectric power projects does not attain all targets related to time and cost because of different risk and uncertainties present in the project. Following work is concentrated towards finding factors which are primarily responsible for time delay and cost overrun which constructing hydropower plant. The work has been done with the help of data, collected through questionnaire surveys with experts. Project failure occurs in terms of time delay and cost overrun.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.