Abstract
A multi-echelon inventory system implies the existence of a hierarchy of stocking locations, and the dependence and interaction between them. We consider a multi-echelon, spare-part inventory management problem with outsourcing and backordering. The problem is characterized by deterministic repair time/cost, and supply and demand that lie within prescribed intervals and that vary over time. The objective is to minimize the total inventory and transportation costs. We develop a network model for problem analysis and present a network flow algorithm for solving the problem. We prove that the Wagner–Whitin property, known for the lot-sizing problem, can be extended to the spare-part inventory management problem under study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.