Abstract

Project monitoring and the related decision to proceed to corrective action are crucial components of an integrated project management and control decision support system (DSS). Earned value management/earned schedule (EVM/ES) is a project control methodology that is typically applied for top-down project schedule control. However, traditional models do not correctly account for the multivariate nature of the EVM/ES measurement system. We therefore propose a multivariate model for EVM/ES, which implements a principal component analysis (PCA) on a simulated schedule control reference. During project progress, the real EVM/ES observations can then be projected onto these principal components. This allows for two new multivariate schedule control metrics (T2 and SPE) to be calculated, which can be dynamically monitored on project control charts. Using a computational experiment, we show that these multivariate schedule control metrics lead to performance improvements and practical advantages in comparison with traditional univariate EVM/ES models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.