Abstract
In order to complete the offshore platform project scheduling intelligently, an improved scheduling optimization system based on the parallel genetic algorithm was proposed. An optimal model for the large-scale offshore platform project scheduling problem (LSOPPSP) was built and produced the mathematic model of LSOPPSP, based on the characteristics of the abundance of activities, long duration, high uncertainty, and frequent changes. In long-term unsteady manufacturing, this model can provide good robustness. In addition, the essential steps of the multitime window parallel genetic algorithm were proposed. An improved population initialization algorithm was designed, as well as the coevolution strategy among populations was also proposed in parallel computing. These two strategies can increase population variety while also speeding up convergence. Finally, the suggested parallel scheduling system was deployed in our self-developed schedule optimization software for offshore platform enterprises, and the outperformance of the improved algorithm was proven by simulated examples and practical application.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.