Abstract

Discrete event simulation (DES) has been established as a frequently used decision-support method in semiconductor manufacturing. One of the key application areas is the planning and scheduling of extended (several days) maintenance activities. The first stage of maintenance activity planning is conducted with a transient long-term simulation model with the focus on evaluating the effect of maintenance activity on the expected fab performance. Decisions such as wafer start reduction or adjustment of delivery commitments among affected work centers are made. The second stage of the planning is initiated several days before the start of the maintenance activities, where resource planning and scheduling of the activity is done through assessment of the expected WIP situation forecasted by a high fidelity online simulation model. In this paper, we will explain this simulation-based multi-stage approach for maintenance activity scheduling. The associated benefits and challenges will be presented with an example use case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.