Abstract
Abstract This paper is concerned with a production planning problem of allocating production items to production shifts on production lines in a multiple objective decision environment. The problem is modeled and solutions are generated using integer goal programming techniques. Objectives are formulated not only in terms of minimizing the sum of deviations from goal target levels, but also in terms of minimizing the maximum deviation. Test results indicate that the model structure and solution process utilized can provide decision makers with a good set of representative solutions in a rather complex multiple objective decision environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.