Abstract

The planning of new units for electrical power generation is a problem which involves different and conflicting aspects. Besides cost, security issues and environmental concerns must be explicitly incorporated into the models. In this way mathematical models become more realistic, and they enhance the decision maker's comprehension of the complex and conflicting nature of the distinct aspects of the problem. A multiple objective linear programming model for power generation expansion planning is presented. The model considers three objective functions (net present cost of the expansion plans, reliability of the supply system, and environmental impacts) and three categories of constraints (load requirements, operational restrictions and budget). Three generating technologies are considered for power system expansion: oil, nuclear and coal.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.