Abstract

We used a multiple-case design to study materials requirements planning (MRP) implementation outcome in 10 manufacturing companies in Singapore. Using a two-phased data collection approach (pre-interview questionnaires and personal interviews), we sought to develop a comprehensive and operationally acceptable measure of MRP success. Our measure consists of two linked components. They are a satisfaction score (a quantitative measure) and a complementary measure based on comments from the interviewees regarding the level of usage and acceptance of the system. We also extended and consolidated a seven-factor critical success factor (CSF) framework using this methodology. CSFs are important, but knowing the linkages between them is even more important, because these linkages tell us which CSFs to emphasize at various stages of the project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.