Abstract
When faced with limited resources, project managers must determine which projects to fund at what levels from a pool of potential ones. This problem of project selection is inherently multiobjective since various factors, such as the available budget, the chance of success, and the efficient allocation of the project team, must be considered simultaneously. The uncertainty of the data at the time decisions are made further complicates project selection. In this paper, a multiobjective, integer-constrained optimization model with competing objectives for project selection is formulated using probability distributions to describe costs. The objectives correspond to important project criteria, such as: rank (value), managerial labor needed, and average cost. The subjective rank is determined via the Analytic Hierarchy Process. The model is applied to a data set from a US government agency that involves 84 separate projects. The results indicate improved budgetary efficiency compared to the actual project selection, thus supporting use of the model for public sector project selection. The model is unique since it integrates multiobjective optimization, Monte Carlo simulation, and the Analytic Hierarchy Process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.