Abstract

Abstract During the last decades, municipalities have increasingly invested in new approaches for rehabilitating sewerage networks. With the increasing number of rehabilitation techniques, objectives and constraints, the number of rehabilitation scenarios rises exponentially. This article proposes an asset management approach to create long-term rehabilitation plans where different budget allocations for rehabilitation techniques are considered every year depending on performance and cost indicators. It builds long-term strategies through multiobjective black-box optimization where the impact of the budget allocations over the network life cycle is part of the decision process. It employs a pipe deterioration model based on Markov chains whose transition matrices are estimated by survival curves for different pipe cohorts. The proposed approach seeks to determine the appropriate investment (CAPEX) and operational expenses (OPEX) levels in the coming decades. It was tested with real-world data from a sewerage network in Sofia, Bulgaria, and the results show that it provides efficient long-term rehabilitation plans.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.