Abstract

In this paper, we focus on the vendor selection problem (VSP) for material supply in large-scale water conservancy and hydropower construction projects, and establish a corresponding model to solve this problem. After stating the problem, we introduce some basic knowledge of level-2 fuzzy sets and the way to transform them to normal fuzzy sets. Then we use the CCP model to handle the bifuzzy objective functions and constraints, based on a series of preparations, we transform the multi-objective integer model under bifuzzy environment into a deterministic model, then use particle swarm optimization (PSO) to solve this problem. The model is illustrated with an actual application to construction material supply.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.