Abstract
In this paper, we focus on the vendor selection problem (VSP) for material supply in large-scale water conservancy and hydropower construction projects, and establish a corresponding model to solve this problem. After stating the problem, we introduce some basic knowledge of level-2 fuzzy sets and the way to transform them to normal fuzzy sets. Then we use the CCP model to handle the bifuzzy objective functions and constraints, based on a series of preparations, we transform the multi-objective integer model under bifuzzy environment into a deterministic model, then use particle swarm optimization (PSO) to solve this problem. The model is illustrated with an actual application to construction material supply.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.