Abstract
Berth scheduling can be described as the resource allocation problem of berth space to vessels in a container terminal. When defining the allocation of berths to vessels container terminal operators set several objectives which ideally need to be optimized simultaneously. These multiple objectives are often non-commensurable and gaining an improvement on one objective often causes degrading performance on the other objectives. In this paper, the authors present the application of a multi-objective decision and analysis approach to the berth scheduling problem, a resource allocation problem at container terminals. The proposed approach allows the port operator to efficiently select a subset of solutions over the entire solution space of berth schedules when multiple and conflicting objectives are involved. Results from extensive computational examples using real-world data show that the proposed approach is able to construct and select efficient berth schedules, is consistent, and can be used with confidence.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Information Technology Project Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.