Abstract
The aim of this contribution is to provide a modeling approach for multi-project manufacturing. Existing approaches for capacity planning and detailed scheduling in those complex environments are using separate models that are linked by instruction and feedback slopes. In contrast, we include multiple levels hierarchically into one simulation model. Thus, the possibilities to propagate restrictions such as precedence dependencies and starting times from gross to detailed levels in a consistent manner are established. The approach is implemented in Java, extending the modeling capabilities of a simulation-based optimization framework. A real-life application to project-oriented aircraft maintenance is presented to highlight the practicality and efficiency of the integrated model for simulation-based capacity planning using work packages as well as detailed scheduling using activities of work plans.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.