Abstract

This paper proposes a multi-agent approach to reconfiguration for power system restoration applied to the more electric aircraft (MEA) power system presenting a redundant power distribution layout. The multi-agent method has been applied in order to make the power system reconfiguration, when fault happened. The restoration process has been achieved by the agents and the simulations have been conducted with different cases of operation mode of the MEA. The restoration configurations were derived through a program written in C++ for the agents and the results confirm the feasibility of applying the multi-agent method for restoring the MEA power system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.